OM-478 Page 27

6-4.

Connecting Auxiliary Power Plant

Ref. S-160 620C

Y

Stop engine.

Y

Power and weld outputs are
live at the same time. Discon-
nect or insulate unused
cables.

Have qualified person install
according to circuit diagram and
Section 12 – Auxiliary Power Guide-
lines.

.

Place CC/CV switch in CC
position when using auxiliary
power plant.

Remove junction box cover.

1

Lead 93

2

Lead 92

3

Lead 91

4

Lead 90 (Neutral)

5

Lead 42 (Circuit Grounding
Lead)

Lead 42 connects to front panel
Ground stud.

6

Isolated Neutral Terminal

7

Jumper Lead 42

8

Grounding Terminal

Jumper 42 is connected to lead 90
at factory. Jumper 42 may be dis-
connected from neutral to meet
applicable electrical codes.

9

User-Supplied Leads

10 Load Terminals

Connect leads to terminals.

11 Fuses F1, F2, And F3

F1, F2, and F3 protect each load line
from overload.

.

Set Engine Control switch to
Run when using auxiliary
power.

.

If max OCV switch is in Off posi-
tion (see Section 5-1), turn Am-
perage/Voltage control to max
for full output from optional aux-
iliary power plant.

10

Tools Needed:

93

91

90

92

Volts

Amps

KVA/KW

Single

120/240

42

10

Three

240

36

15

60 Hz

Frequency

Engine Speed

Max. Fuse Size

45 Amperes

1850 RPM

AC

Phase

1

Phase

3

Output

Lead 42 connects to GROUND stud on
front of unit.

Jumper 42 is connected to 90 at factory.

240V

120V

120V

240V

240V

240V

1

3

F3

F2

F1

4

5

8

1

2

3

6

7

9

11

Generator Windings

(See Section 9 For

Complete Circuit)

Advertising