4. battery charging procedure – Hobart Welding Products POWERPAK OM-478 User Manual

Page 34

Advertising
background image

OM-478 Page 30

7-4.

Battery Charging Procedure

Ref. ST-184 780-C / S-115 587-B

Stop Engine.

Connect Cables

(Observe Correct

Polarity).

Set Battery Voltage Switch.

Set Charge/Jump Start

Switch To Charge.

Set Amperage/Voltage

Switch To Panel And Out-

put (Contactor) Switch To

Remote. Turn Off
Remote Devices.

+

Start Engine.

If Battery Light Goes On,

Stop Engine And Check

Connections.

Set Output (Contactor)

Switch To On Or Turn On

Remote Device.

If Battery Light Goes On,

Stop Engine And Check

Battery Condition.

Set Output Selector Switch To Charge.

In Example:
Battery Voltage = 12 Volts
Battery CCA Rating = 500
Charge Current = 100 A (See Section 7-3)
Ampere Range Setting = 90 to 190 A
A/V Control Setting = 10

Charge 10 minutes. Check Bat-
tery Voltage. Continue charging

if necessary.

Determine Charge Current From

Battery CCA Rating And Chart

(See Section 7-3).

Y

Do not switch under load.

Set Amperage.

Y

Do not switch Ampere Ranges
while under load.

Advertising