Connection to ice machine (cont.), Pvc conduit connection, Not supplied) – Manitowoc Ice AUCS Q User Manual

Page 17

Advertising
background image

Section 2

Installation Instructions

2-9

Q1400C ONLY

A.

1/4" DIA x 4" LG VINYL TUBING



B.

1/2" PVC CONDUIT FITTING (QTY 2)




C.

90

° THREADED ELBOW





D.

1/4" FERRULE NUT




E.

90

° BARBED ELBOW




F.

3/8" HOSE CLAMP (QTY 2)




G.

1/2" LOCKNUT (QTY 2)

A. Slide the 1/4" ferrule nut (part D) onto the 1/4"

tubing (part A)

B. Connect the 1/4" ferrule nut (with 1/4" tubing)

to the 90

° threaded elbow (part C) and hand

tighten.

C. Locate the 7/16" diameter hole in the bulkhead

of the ice machine. (See illustration).

D. Remove the plastic plug from the hole.
E. Insert the threaded end of the barbed elbow

(part E) into the hole. Screw the 90

° threaded

elbow (part C) to the barbed elbow (part E).
Hand tighten. Be sure the threaded elbow (part
C) outlet tube points downward, toward the
water trough.

Advertising