9.2

Run-In Procedure Using Load Bank

S-0683

Y Stop engine.
Y Do not touch hot exhaust

pipe, engine parts, or load

bank/grid.

Y Keep exhaust and pipe away

from flammables.

1

Load Bank

Turn all load bank switches Off. If

needed, connect load bank to 115

volts ac wall receptacle or genera-

tor auxiliary power receptacle.
2

Welding Generator

Set Amperage control at min.
3

Weld Cables

Connect load bank to generator

weld output terminals using proper

size weld cables with correct

connectors. Observe correct

polarity.
Start engine and run for several

minutes.
Set load bank switches and then

adjust Amperage control so load

and output are 180 A.
Check generator and load bank

meters after first five minutes then

every fifteen minutes to be sure

generator is loaded properly.

.

Check oil level frequently dur-
ing run-in; add oil if needed.

After one hour (minimum), place

Amperage control in minimum posi-

tion, then turn off load bank to

remove load. Run engine several

minutes at no load.
Y Stop engine and let cool.
4

Engine Exhaust Pipe

Repeat procedure if wetstacking is

present.