Remove the trailing cable cover assembly – Integra CROMA24 User Manual

Page 105

Advertising
background image

Assembly\Disassembly

105

ASSEMBL

Y/

DISASSEMBL

Y

Croma24 Service Manual

e.

Turn the Carrier Assembly over and insert the Paper

Sensor flex cable into the connector at J3.

f.

Push both sides of the connector lock shut at the same

time.

2.

To install the Encoder Sensor:

a.

Turn the Carrier Assembly so that the bottom side of it is

facing up.

b.

Push down on the plastic clip and slide the back of the

Encoder Sensor over it.

c.

Push the Encoder Sensor in past the ridges until the

Encoder Sensor snaps into place.

d. Turn the Carrier Assembly over and insert the Encoder
flex cable into the connector at J2.

e.

Push both sides of the connector lock shut at the same

time.

3.

Perform the Carrier Assembly, Carrier Belt, and the Frame
Tensioner Reinstallation procedures to reinstall the Carrier
Assembly.

Remove the Trailing Cable Cover Assembly

1.

Perform the Left, Middle, and Right Cover Removal
procedures to remove the Left, Middle and Right Covers.

2.

If you have not already removed the Carrier Assembly from
the Slide Shaft, you will need to perform Steps 3 through 7 of
the Removing the Carrier Assembly, Carrier Belt, and the
Frame Tensioner procedures in order to remove the
Electronics Cover and release the left end of the Trailing
Cable from the Carrier PCB.

3.

Disconnect the Ferrite and Ferrite Bracket from the Strain
Relief by turning the Strain Relief over and pushing down on
the Ferrite Bracket’s catch until it can pass under the Strain
Relief. Pull the Ferrite Bracket clear from the Strain Relief.

Advertising