Ice frost generic (pre-mix), Ice frost generic (post-mix) – Cornelius ICE FROST User Manual

Page 11

Advertising
background image

Ice Frost Operator’s Manual

© 2004-2006, IMI Cornelius Inc.

- 7 -

Publication Number: M620919596OPR

B

OWL

L

OADING

O

PERATIONS

Ice Frost Generic (Pre-mix)

WARNING: If the unit runs out of product and is turned off and turned back on without a new
(full) product tank installed the sensor will look for product for 4 minutes. During this 4
minute period CO

2

will be purged from the bowl.

Ice Frost Generic (Post-mix)

• Switch the machine’s main switch to the ON position (1).

• Put the switch (A) into the ON position (1) see FIGURE 5,

switch A. Controls the flow of the product in the bowls.

• The machine’s bowls will now fill up until the maximum level

is reached.

• Continue with start up operations.

FIGURE 5

• Switch the machine’s main switch to the ON position (1).

• Make sure the switch (L1) is in the OFF position (0) -

FIGURE 6 - (switch L1 controls the flow of the products in the
bowls).

• Turn mixing motors OFF immediately. Do not run units with

bowls empty.

• Using an 1/8 inch (8 mm) socket wrench (E1), loosen the nut

that holds the post-mix valve (D1).

• Twist nozzle counter-clockwise (F1), lift the post-mix valve

(D1) up slightly and turn it towards the outside. leaving
nozzle and coupling attached to the bowl.

FIGURE 6

Advertising