Installing, Support, Rails – IBM Partner Pavilion DS4100 User Manual

Page 56: Figure

Advertising
background image

5.

Starting

with

the

left

rail,

remove

and

save

the

6/32

in.

screw

(

5 ).

Loosen

the

four

rail

adjustment

screws

(

2 ).

Note:

The

support

rails

are

not

marked

as

Left

or

Right.

However,

each

rail

can

be

correctly

mounted

on

only

one

side

of

the

rack

cabinet.

The

rails

should

be

mounted

with

the

alignment

pins

at

the

front

of

the

rack

cabinet.

Figure

12

shows

the

installation

of

the

left

support

rail.

6.

Hold

the

front

of

the

rail

against

the

inside

of

the

right

rack-mounting

flange

and

loosely

tighten

the

lower

M6

screw

(

4 ).

See

Figure

9

on

page

21

for

the

location

for

this

screw.

7.

Extend

the

rear

of

the

support

rail

until

it

makes

contact

with

the

rear

rack

rail.

8.

From

the

rear

of

the

rack,

thread

and

tighten

two

M6

screws

(

1 )

(see

Figure

10

on

page

22

for

the

location

for

these

screws).

From

the

front

of

the

rack

cabinet,

finish

tightening

the

front

M6

screw

(

4 ).

When

you

are

the

finished,

the

rail

should

be

attached

to

the

cabinet

using

one

M6

screw

in

the

front

(inserted

at

the

second-to-lowest

hole)

and

two

M6

screws

at

the

back.

9.

Repeat

step

5

through

step

8

for

the

right

rail.

10.

Tighten

the

rail

adjustment

screws

2

on

both

rails.

11.

Continue

with

“Removing

the

CRUs”

on

page

25.

Rear of Rack

5

5

6

f10ug050

Figure

12.

Installing

the

support

rails

24

IBM

TotalStorage

DS4100

Storage

Server:

Installation,

User’s,

and

Maintenance

Guide

Advertising