GB300 BOILER INSTALLATION AND OPERATION INSTRUCTIONS

Page 35

HEATING SYSTEM PIPING

NOTE: The boiler jacket must be installed before
connecting the heating system piping and controls.

All heating system piping must be installed by a qualified
technician in accordance with the latest revision of the
ANSI/ASME Boiler and Pressure Vessel Code, Section
IV, and ANSI/ASME CSD-1, Standard for Controls and
Safety Devices for Automatically Fired Boilers. All
applicable local codes and ordinances must also be
followed. A minimum clearance of 1" must be maintained
between heating system pipes and all combustible
construction.

CAUTION: Improper piping of this boiler can cause
flooding and extensive property damage!

Ensure that the boiler is level from front to back and from
side to side. Use metal shims to level the boiler. NEVER
use wood, plastic or other combustible materials as
shims.

If a boiler is installed above any radiation elements it
must be fitted with a low water cutoff device.

WATER BOILER PIPING CONNECTIONS
The supply and return connections should be sized to
suit the system, see Figure 94 & Table 4. Do not pipe
the supply from the bottom port or the return to the top
port, the boiler will not work properly.

Figure 94

Water & Steam Control Tapings

Tapping

Size

Water

Steam

1

4"

Supply & Optional

Optional Safty Valve

Tankless Heater

Location &

Skim Tapping

2

3"

Return & Boiler

Return & Boiler

Drain/Blowoff

Drain/Blowoff

3

1-1/2"

Water Relief Valve

Steam Relief Valve &

Optional Control

Tree Location

4

3/4"

Temp./Pressure Gauge

2

N/A

5

3/4"

High Limit

2

Gauge Glass

3

6

3/4"

Operating Control

2

Control Tree

(see Figure 99)

7

3/4"

Optional Probe

Optional Probe

LWCO

LWCO

3

8

1"

Optional Float

Optional Float

LWCO’s

LWCO’s

3

Notes:
1. The left end section contains the same tappings as the right end

section.

2. These controls must be located on the supply piping side of the

boiler.

3. These controls must be located on the steam equalizer piping

side of the boiler.

1

4

3

5

6

7

6

8

8

8

2