GB300 BOILER INSTALLATION AND OPERATION INSTRUCTIONS

Page 39

Table 6 should be used to ensure that the gas supply
piping is sized properly. If more than one appliance is
supplied by the same supply pipe, the piping must be
sized based on the maximum possible demand. Do not
neglect the pressure drop due to pipe fittings. Table 6
should be used in conjunction with Table 7 to ensure
that the supply piping has the capacity to meet the
demand.

Table 6

Gas Pipe Capacity

Maximum pipe capacity in ft

3

/hr based on 0.60 specific gravity gas

at a pressure of 0.5 psig or less and a 0.3" WC pressure drop.

Nominal

Pipe length in feet

Iron Pipe

10

20

30

40

50

60

80

100

150

Size, (in)

Maximum gas volume of pipe, (ft

3

/hr)

1"

520

350

285

245

215

195

170

150

120

1-1/4"

1050 730

590

500

440

400

350

305

250

1-1/2"

1600 1100 890

760

670

610

530

460

380

2"

3050 2100 1650 1450 1270 1150 990

870

710

2 1/2"

4800 3300 2700 2300 2000 1850 1600 1400 1130

3"

8500 5900 4700 4100 3600 3250 2800 2500 2000

Note:
Multiply the gas volume by 0.62 for propane flow capacity in ft

3

/hr.

Multiply the propane flow capacity by 2500 Btu/ft

3

to determine the

propane Btu/hr capacity for a given pipe size and length.

Table 7

Equivalent Pipe Length Chart

Nominal

Type of pipe fitting

Iron Pipe

90 Elbow

Tee

1

Gate Valve

2

Gas Cock

2

Size, (in)

Equivalent pipe length, (ft)

1"

2.6

5.2

0.6

1.5

1-1/4"

3.5

6.9

0.8

1.9

1-1/2"

4.0

8.0

0.9

2.3

2"

5.2

10.3

1.2

3.0

2-1/2"

6.2

12.3

1.4

3.7

3"

7.7

15.3

1.8

4.5

Notes: 1. For flow through branch.

2. For flow at full open.

Figure 100 depicts the proper way to connect the boiler
to the gas supply piping. The manual shut-off valve
MUST be installed in the supply piping. It should be
approximately 5 feet above the floor. Provide a sediment
trap at the bottom of the vertical section of the gas
supply pipe upstream of the gas controls. A ground joint
union should be installed between the boiler gas
controls and the supply piping. Each of these items are
needed to ensure long life and ease of servicing.
Always use a pipe sealant that is suitable for use with
LP gas.

CAUTION: Always use a wrench on the gas valve
body when making gas connections to it. Never over-
tighten the piping entering the gas valve body or gas
valve failure may result!

CAUTION: Make up water connections must be made
to the return piping, not directly to the boiler or boiler
damage may result.

Locate the boiler blow off preferably opposite the return
piping connections. Blow off valves must be sized equal
to, or larger than, the steam relief valve. Any discharge
piping is to be full size to the point of discharge.

Assemble the control tree and low water cutoff as shown
in Figure 99. Use Figure 94 to locate the control tree
and low water cutoff on the boiler.

Table 5

Riser, Equalizer & Header Pipe Sizes

Boiler Model

Risers

Equalizer

Header

GB300-5 to -9

1 @ 3"

1-1/2"

3"

GB300-10 to -15

2 @ 3"

2"

4"

GB300-16 to -21

3 @ 3"

3"

5"

Figure 99

Steam Control Tree

GAS SUPPLY PIPING

WARNING: Check the boiler rating plate to make
sure that the boiler is for the type of gas that will
be used. If it isn’t, do not connect the boiler to
the gas supply. Failure to comply with this
warning can result in extensive property damage,
severe personal injury or death!

The GB300(S,W) boiler comes from the factory ready to
be piped to the gas supply. If for any reason the boiler is
not for the type of gas available at the installation site,
call the nearest Smith Cast Iron Boiler distributor to
resolve the problem.

STEAM
GAUGE

MANUAL RESET
HIGH LIMIT

PET COCK

SYPHON

GAUGE
GLASS

L.W.C.O.
(OPT.)

SYPHON

OPERATIG
CONTROL