Stop, Important – Sega INITIAL "D" TYPE TWIN. User Manual

Page 53

Advertising
background image

44

www.seuservice.com

45

www.seuservice.com

10-2 SYSTEM TEST MODE

In the SYSTEM TEST MODE, IC BD functioning can be checked, the monitor adjusted, and the
coin setting performed.
Refer to NAOMI NETWORK SYSTEM SERIVCE MANUAL for the details. Note that the set-
ting of the following items need to be performed in accordance with the instruction given.

CABINET TYPE : 1 PLAYER(S)

MONITOR TYPE : HORIZONTAL

SERVICE TYPE : COMMON

COIN CHUTE TYPE : COMMON

NETWORK TYPE : NONE

The SEQUENCE SETTING items of COIN/CREDIT SETTING are as follows.

SEQUENCE SETTING

SEQUENCE 1:

Number of credits required for starting the game.

SEQUENCE 2:

Number of credits required for continuing the play.

SEQUENCE 3:

Number of credits required for dedicated CARD purchase.

SEQUENCE 4~8:

NOT USED

The contents of settings changed in the TEST mode are stored when the test

mode is finished from EXIT in the menu mode. If the power is turned off
before the TEST mode is finished, the contents of setting change become inef-
fective.

Executing "BACKUP DATA CLEAR" in the SYSTEM TEST MODE does

not clear the BOOKKEEPING data in the GAME TEST mode.

Entering the TEST mode clears fractional number of coins less than one credit

and BONUS ADDER data.

Perform setting as per specified in this manual for operation. If setting not

specified is performed for operation, proper function of this product may not
be obtained.

STOP

IMPORTANT!

Advertising