Iv ballast installation – Saleen 10-8002-C11670C User Manual

Page 10

Advertising
background image

10



IV Ballast Installation













Part Number

Descriptions

Qty

00-9011-C11360*

SCREW, BUTTON HD SOCKET CAP SCREW, 18-8 SS, 10-32X1.25"

5

00-9003-C11359*

LOCKNUT, NYLON 18-8 SS, 10-32

5

06-1202-C11361A

SPACER, BALLAST 1/2" PLASTIC

2

06-1202-C11362A

SPACER, BALLAST .75" PLASTIC

3




















Tools needed

• ¼ ” drive 1/8” Alan socket

• ¼” drive 3/8” deep socket
• ¼” drive 10 mm shallow socket

• 8” Extension, ¼” drive

• ¼” drive ratchet
• Panel puller

• Drill

• Drill bit ¼”
• Drill bit 1/8”

1. Remove the fender liners. Figure 1 is

an over view where the push screws are
located. Figures 2 and 3 are close ups.
Use the panel puller to remove push
screws.

Figure 1

Figure 2

Figure 3

Advertising