How to use this manual – Siemens BACnet ATEC 125-5050 User Manual

Page 7

Advertising
background image

How To Use This Manual

7

Siemens Industry, Inc.

BACnet ATEC Owner's Manaul

125-5050, Rev. AA

4/20/2010

How To Use This Manual

This manual is written for the owner and user of the Siemens Industry BACnet VAV

Actuator. It is designed to help you become familiar with the Siemens BACnet VAV

Actuator and its applications.
This section covers manual organization, manual conventions, symbols used in the

manual, and other information that will help you use this manual.

Manual Organization

This manual contains the following chapters:

Chapter 1, Hardware,

describes the hardware components and the accessories

that are used with the BACnet VAV Actuator.

Chapter 2, Applications for BACnet VAV Actuator,

describes the control

applications available in the model of the BACnet VAV Actuator that includes a

terminal block for wireable input/output connections.

Chapter 3, Point Database,

defines the point database descriptors and includes

address and applications.

Chapter 4, Troubleshooting,

describes basic corrective measures you can take

should you encounter a problem when using the BACnet VAV Actuator. For issues

not covered in this chapter, consult your local Siemens Industry representative.

The

Glossary

describes the terms and acronyms used in this manual.

The

Index

helps you locate information presented in this manual.

Manual Conventions

The following table lists conventions to help you use this manual in a quick and

efficient manner.

Convention

Examples

Numbered Lists (1, 2, 3…) indicate a

procedure with sequential steps.

1. Turn OFF power to the field panel.
2. Turn ON power to the field panel.
3. Contact y the local Siemens Building

Technologies representative.

Conditions that must be completed or met

before beginning a task are designated with a

⊳.
Intermediate results (what will happen

following the execution of a step), are

designated with a ⇨.
Results, which inform the user that a task was

completed successfully, are designated with a

⇨.

⊳Composer software is properly installed.
⊳A Valid license is available.
1. Select Start > Programs > Siemens > GMS

> Composer.
⇨The Project Management window displays.
2. Open an existing project or create a new

one.
⇨The project window displays.

Actions that should be performed are specified

in boldface font.

Type F for Field panels.
Click OK to save changes and close the

Advertising