Chapter 2 server installation, 1 overview, 3 preparing for setup – SUPER MICRO Computer SUPERSERVER 6012L-6 User Manual

Page 17

Advertising
background image

Chapter 2: Server Installation

2-1

Chapter 2

Server Installation

2-1 Overview

This chapter provides a quick setup checklist to get your SuperServer

6012L-6 up and running. Following these steps in the order given should

enable you to have the system operational within a minimum amount of time.

This quick setup assumes that your SuperServer 6012L-6 system has come

to you with the processors and memory preinstalled. If your system is not

already fully integrated with a motherboard, processors, system memory

etc., please turn to the chapter or section noted in each step for details on

installing specific components.

2-2

Unpacking the SuperServer 6012L-6

You should inspect the box the SuperServer 6012L-6 was shipped in and

note if it was damaged in any way. If the server itself shows damage you

should file a damage claim with the carrier who delivered it.

Decide on a suitable location for the rack unit that will hold the SuperServer

6012L-6. It should be situated in a clean, dust-free area that is well venti-

lated. Avoid areas where heat, electrical noise and electromagnetic fields

are generated. You will also need it placed near a grounded power outlet.

Read the Rack and Server Precautions in the next section.

2-3

Preparing for Setup

The box the SuperServer 6012L-6 was shipped in should include two sets

of rail assemblies, two rail mounting brackets and the mounting screws you

will need to install the system into the rack. Follow the steps in the order

given to complete the installation process in a minimum amount of time.

Please read this section in its entirety before you begin the installation

procedure outlined in the sections that follow.

Advertising