Choosing a Setup Location:

- Leave enough clearance in front of the rack to enable you to open

the front door completely (~25 inches).

- Leave approximately 30 inches of clearance in the back of the rack

to allow for sufficient airflow and ease in servicing.

Rack Precautions:

- Ensure that the leveling jacks on the bottom of the rack are fully

extended to the floor with the full weight of the rack resting on them.

- In single rack installation, stabilizers should be attached to the rack.

- In multiple rack installations, the racks should be coupled together.

- Always make sure the rack is stable before extending a component

from the rack.

- You should extend only one component at a time - extending two or

more simultaneously may cause the rack to become unstable.

Server Precautions:

- Review the electrical and general safety precautions in Chapter 4.

- Determine the placement of each component in the rack

before

you

install the rails.

-

Install the heaviest server components on the bottom of the rack

first, and then work up.

- Use a regulating uninterruptible power supply (UPS) to protect the

server from power surges, voltage spikes and to keep your

system operating in case of a power failure.

-

Allow the hot plug SCSI drives and power supply units to cool before

touching them.

-

Always keep the rack's front door and all panels and components on

the servers closed when not servicing to maintain proper cooling.

!

!