Chapter 2 Installation

Series 24-HP Instruction Manual

2-16

IM-24-HP

Insertion Procedure for Flow Meters with No Insertion Tool

(Packing Gland Connection)

1. Calculate the required sensor probe insertion length.

2. Fully retract the stem until the sensor head is touching the bottom of the

stem housing. Remove the two top stem clamp nuts and loosen two
stem clamp bolts. Slide the stem clamp away to expose the packing
gland nuts. Loosen the two packing gland nuts.


3. Align the sensor head using the sensor alignment pointer. Adjust the

alignment pointer parallel to the pipe and pointing downstream.


4. Insert the sensor head into the pipe until insertion length, I, is

achieved. Do not force the stem into the pipe.


5. Tighten the packing gland nuts to stop leakage around the stem. Do

not torque over 20 ft-lbs.


6. Slide the stem clamp back into position. Torque stem clamp bolts to

15 ft-lbs. Replace the stem clamp nuts and torque to 10-15 ft-lbs.

Warning!

The line pressure

must be less than

50 psig for installation.

Caution!

The sensor alignment

pointer must point

downstream, in the

direction of flow

.