L-3 Communications Navigation Echosounder LAZ 5100 User Manual

Page 69

Advertising
background image

Page 5-6

L-3 ELAC Nautik

5.1.2

INITIAL SYSTEM SET-UP

After installation of the LAZ 5100 please follow this procedure for setting into operation the first
time.

No.

Item

Result

1.

Installation check

1.1

Main supply (X3)

1.2

Transducer (X1, X2) – cable screening, cable laying

1.3

Printer (X7) – max. cable length 5 m

1.4

NMEA – Output (X8) – RS 422

1.5

NMEA – Input (X4) – RS 422

1.6

Start / Stop – Output (X8)

1.7

NMEA – Output (X6) – RS 422

2.

Setting into operation

2.1

Disconnect Printer, NMEA - Input and Output

2.2

Only Main Supply and Transducer connected

2.3

Switch „ON“ the unit

2.4

Check and do basically settings
- frequency
- sound velocity (1.500 m/s)
- blocking depth (2 - 2.9 m)
- draft, trim
- NMEA - Interface (4.800 baud, 8N1)
- date and time

2.5

Check the function of the unit
- depth recording
- LC - Display

2.6

Check distortion level
- select 500 m range
- select item Manual Gain
- select gain Vmax (15)
- no or light distortion shall appear on the LCD – screen
- reduce gain, until the screen is free of distortion
- notice gain level
- return to normal mode

2.7

Connect NMEA - Output (if requested)
- check data at receiving unit

2.8

Connect NMEA - Input (if requested)
- check data on LC- Display

2.9

Connect Printer (if available)
- check recording on printer

2.10

Connect Start/Stop - Output (i.e. DAZ 13) (if requested)

3.

Sea Trial

3.1

Check the performance of the transducer
- distortion (airbubbles, turbulence) under the
- recording free of electrical noise?
- depth indication, analogue and digital

Advertising