22 Wiring Connections

4. The UPS Module Output Neutral is connected to one common point and solidly grounded per

requirements of the National Electrical Code. The ground connection inside the UPS cabinet

may be required by the power wiring configuration at your site.

5. For Battery Cabinets:

DC power cables (and ground) from Battery Cabinet to UPS Module, and between Battery

Cabinets. Observe polarity.

6. For remote battery:

DC power cables (and ground) from battery to Module Battery Disconnect, and then to UPS

Module DC bus. Observe polarity.

7. Module Battery Disconnect control wiring to UPS Module, and between Battery Cabinets.
8. Control wiring to Remote Monitor Panel, if used. Selected alarm messages are also available

for customer use through a set of contacts on a separate terminal board. Wiring must be run

in individual separate steel conduit.

9. Emergency Power Off control wiring must be run in separate steel conduit.
10. Communications wiring for site monitoring or for modem must be run in separate steel

conduit.

11. Power and control connections required for the Maintenance Bypass.
12. Any additional special wiring required at your site.

!

CAUTION
UPS bypass and output neutral must be connected to only one

common point in the UPS. This neutral line must be grounded at

the source.

NOTE
DC power and battery circuit breaker control cables are provided with the

matching Battery Cabinet.

!

WARNING
DO NOT MAKE ANY CONNECTIONS BETWEEN BATTERY TIERS

IN THE BATTERY CABINET. THESE CONNECTIONS WILL BE

MADE BY THE LIEBERT CUSTOMER SERVICE

REPRESENTATIVE DURING START-UP.