Troubleshooting & repair, Control rectifier test (continued), Test procedure – Lincoln Electric POWER MIG SVM165-A User Manual

Page 70

Advertising
background image

TROUBLESHOOTING & REPAIR

F-24

F-24

POWER MIG 350MP

Retur

n to Section TOC

Retur

n to Section TOC

Retur

n to Section TOC

Retur

n to Section TOC

Retur

n to Master TOC

Retur

n to Master TOC

Retur

n to Master TOC

Retur

n to Master TOC

CONTROL RECTIFIER TEST (continued)

FIGURE F.5

FIGURE F.6

-

+

CONTROL RECTIFIER

+

6800/75

X6

X5

X4

X3

30 VAC

115 VAC

FAN

LOCATED ON

TRANSFORMER

BAFFLE

+ 42VDC

TEST PROCEDURE

1. Find the following leads at the control rectifier using

figures F.5 and F.6.

2. Carefully connect the meter probes to the exposed

lead connections.

3. Turn the machine ON to conduct the voltage test.

4. If the DC voltage tested is incorrect or missing, and

the AC voltages are correct, the control rectifier
bridge or capacitor may be faulty.

From Lead

471B

To Lead

Expected Voltage

472B

42 VDC

X5

X6

30 VAC

CONTROL RECTIFIER

Advertising