Trouble diagnosis – LG SXS GR-P257/L257 User Manual

Page 79

Advertising
background image

3-5. Standard Regulations For Heavy Repair

TROUBLE DIAGNOSIS

- 77 -

Items

Precautions

4) Refrigerant Charging

Charge refrigerant while operating a compressor as shown above.

5) Pinch a charging pipe with a pinch-off plier after completion of charging.

6) Braze the end of a pinched charging pipe with copper brazer and take a gas leakage test

on the welded parts.

6. Gas-leakage test

* Take a leakage test on the welded or suspicious area with an electronic leakage tester.

7. Pipe arrangement

Check each pipe is placed in its original

in each cycle

place before closing a cover back-M/C

after completion of work. Particularly

control the size of Joint Drain Pipe

Compressor

Condenser

Drier

Evaporator

Bombe

1) Observe the safety precautions for gas handling.

2) Use JIG (or wet towel) in order to prevent electric wires from burning during welding. (In order to prevent insulation

break and accident.)

3) The inner case shall be melted and insulation material (polyurethane) shall be burnt if not cared during welding inner

case parts.

4) The copper pipe shall be oxidized by overheating if not cared during welding.

5) Not allow the aluminum pipes to contact to copper pipes. (In order to prevent corrosion.)

6) Observe that the inserted length of a capillary tube into a drier should be 12 mm.

7) Make sure that the inner diameter should not be distorted while cutting a capillary tube.

8) Be sure that a suction pipe and a filling tube should not be substituted each other during welding. ( High efficiency

pump.)

12 mm

+

3

-

0

Drier

Molecular Pipe

Molecular
Sieves

+3
-0

Advertising
This manual is related to the following products: