Powerware Ferrups FE/QFE 500VA User Manual

Page 73

Advertising
background image

Phase Check

67

Powerware

®

FERRUPS FE/QFE UPS (500 VA–18 kVA) Installation Guide

:

Rev A www.powerware.com

External Bypass Switch

BPE-01

AC from UPS
Output

Measurement

AC Line Input

Measurement

5 to 6

Vac

8 to 9

Vac

BPE-02, BPE-04, or BPE-05

AC from UPS
Output

Measurement

AC Line Input

Measurement

7 to 8*

Vac

11 to 12

Vac

6 to 7

Vac

10 to 11

Vac

6 to 8*

Vac

10 to 12

Vac

*60 Hz, 208 or 240V only.

9. If the bypass switch is a Break-Before-Make type, skip this step

and proceed to Step 10.

If the bypass switch is a Make-Before-Break type, verify that the
AC voltages from the UPS and the AC line input are in phase.
Measure the voltage between the following points on the
terminal strip. These measurements must be no more than
100 Vac; if they are, call your service representative.

Internal Bypass Switch

X1 to L1

Vac

X2 to L2*

Vac

*60 Hz, 208 or 240V only.

External Bypass Switch (BPE-01)

6 to 9

Vac

External Bypass Switch (BPE-02, BPE-04, or BPE-05)

7 to 11

Vac

8 to 12*

Vac

*60 Hz, 208 or 240V only.

Advertising