5 battery installation, 5 battery installation -17, Smart i/o user’s manual – Pepper Computer Modular Computers RS485 User Manual

Page 29: Introduction

Advertising
background image

SMART I/O User’s Manual

©1996 PEP Modular Computers GmbH

March 12, 1996

Page 1 - 17

Introduction

1

1.4.5 Battery Installation

The battery piggyback SMPBBAT is fitted into the socket BU3 on the

SMART-BASE. It is important that the piggyback is inserted in the correct

way. The figure below illustrates this procedure.

Figure 1.4.5.1: Battery Piggyback Installation

SMPBLED

BU3

Pin 1

Pin 5

SMPBBAT

Battery

WARNING!

Once fitted on the board, the battery should be on the right hand side of the

SMPBBAT piggyback. If the battery needs to be replaced, it must only be

done with a replacement SMPBBAT piggyback, the order number of which

is shown in the Ordering Information section of this manual.

The temperature on the battery must not exceed +70

°

C, due to the risk of

battery damage! For SMART I/O modules with extended temperature ranges

of up to 85

°

C, a special lithium battery must be fitted to the SMPBBAT.

Battery Type

3V Lithium BR2032

3V Lithium CR14250

Battery Capacity

190mAh

850mAh

Typical Data Retention Time *140 Days

590 Days

* this is the time without the main power being applied

Advertising
This manual is related to the following products: