Mgc-100 hardware installation, Unpacking and positioning the mgc-100, Mgc-100 hardware installation -2 – Polycom DOC2237A User Manual

Page 22: Unpacking and positioning the mgc-100 -2

Advertising
background image

Chapter 2 - Hardware Installation

2-2

MGC-100 Hardware Installation

Unpacking and Positioning the MGC-100

To unpack and position the MGC-100:

1.

When you receive your MGC-100, inspect the equipment for damage
and verify that the components match the packing slip. If you did not
receive a component or if there is damage to the system, notify your
service representative immediately.

Figure 2-1: MGC-100 package

2.

Place the MGC-100 unit on a stable flat surface in a location that meets
the MGC environment requirements, which are:

Operating temperature: 10°–40°C (50°–104°F)

Humidity: 15%–90% non-condensing

Altitude: Up to 3,000m (10,000ft)

ESD: +8 kV

Carrying Strap

Lock in Open Position

Wood Packing Case

Lock in Closed Position

Advertising