Polycom DOC2237A User Manual

Page 23

Advertising
background image

MGC Hardware and Installation Manual

2-3

3.

Release the clasp locks at the bottom, and lift the MGC-100 top cover.

Figure 2-2: Unpacking the MGC-100

4.

Lift the MGC-100 unit and remove the packaging material.

5.

Lower the MGC-100 unit, placing it on the surface.
If the MGC-100 is a standalone unit, place it on a flat surface. If you are
rack mounting the MGC-100, allow a minimum clearance of 3” above
the unit. If you are rack mounting the NEBS MGC-100, the 3” above the
unit is not needed. Refer to the NEBS Standards for clearance
compliance.

Foam Block

Foam Block

Wood Packing Case

Advertising