Mgc-50 hardware installation, Unpacking and positioning the mgc-50, Mgc-50 hardware installation -21 – Polycom DOC2237A User Manual

Page 41: Unpacking and positioning the mgc-50 -21

Advertising
background image

MGC Hardware and Installation Manual

2-21

MGC-50 Hardware Installation

Unpacking and Positioning the MGC-50

To unpack and position the MGC-50:

1.

When you receive your MGC-50, inspect the equipment for damage and
verify that the components match the packing slip. If you did not receive
a component or if there is damage to the system, notify Polycom
immediately.

Figure 2-11: MGC-50 package

2.

Place the MGC-50 unit on a stable flat surface in a location that meets
the MGC-50’s environment requirements, which are:

Operating temperature: 10°–40°C (50°–104°F)

Humidity: 15%–90% noncondensing

Altitude: Up to 3,000m (10,000ft)

ESD: +8 kV

Carrying Strap

Lock in Open Position

Wood Packing Case

Lock in Closed Position

Advertising