Energy distribution acute2 twin – Profoto ACUTE2 1200 User Manual

Page 20

Advertising
background image

20

Energy distribution Acute2 twin

One generator

1. Connect the head sockets to the two B sockets on the

generator.

2. Reduce the energy one f-stop by switching A+B / A<->B

switch to position A<->B.

3. Further reduce the energy one or two f-stops by halving or

quartering the energy with the B-switch.

4. Use the dial BRACKET for fine adjustments and to further

reduce the energy by two f-stops.

Two generators

1. Connect the head socket to socket A on each generator.

2. Reduce the energy one f-stop by switching A+B / A<-> B

switch to position A< -> B on both generators.

3. Further reduce the energy one or two f-stops by halving or

quartering the energy with the A-switch on both generators.

4. Use the dial BRACKET for fine adjustments and to further

reduce the energy by two f-stops on both generators.

Advertising