NOTE: While a drain connection is required in the

vent of all XFyre installations, the drain can be ac-

complished in several different ways. The figures in

this manual show the drain in a vent tee, however,

this can also be accomplished using an inline collec-

tor for condensing stacks or an inline vertical or

horizontal collector available from several of the

listed vent manufacturers.

CAUTION: This venting system requires the

installation of a condensate drain in the vent piping

per the vent manufacturer’s instructions. Failure to

install a condensate drain in the venting system will

void all warranties on this boiler.

Installation

These installations utilize the heater-mounted blower

to draw combustion air and to vent the combustion

products to the outdoors. The combustion air intake

and the vent are installed horizontally through the wall

to the outdoors. Adequate ventilation air must be sup-

plied to the equipment room in accordance with the

NFGC (U.S.) or B149 (Canada).

The total length of the horizontal through-the-wall

direct vent system should not exceed 200 equivalent ft

in length. If combined vent/intake run exceeds 200

WARNING: No substitutions of flue pipe or vent

cap material are allowed. Such substitutions would

jeopardize the safety and health of inhabitants.

equivalent ft, an appropriately sized variable-speed

extractor must be used. Each elbow used is equal to

10 ft of straight pipe with a maximum of 4 elbows each

on the air intake and vent.

The vent and air intake runs should be balanced to

provide approximately the same equivalent length.

The vent cap and air intake elbow are not considered

in the overall length of the venting system.

The vent must be installed to prevent flue gas leakage.

Care must be taken during assembly to ensure that all

joints are sealed properly and are airtight. The vent

must be installed to prevent the potential accumulation

of condensate in the vent pipes. It is required that:

1. The vent must be installed with condensate drains

as directed by the vent manufacturer.

2. The vent must be installed with a slight upward

slope of not less than 1/4 inch per foot of horizon-

tal run to the vent terminal.

Termination

The vent cap MUST be mounted on the exterior of the

building. The vent cap cannot be installed in a well or

below grade. The vent cap must be installed at least 1

ft above ground level and above normal snow levels.

Only Raypak-approved vent caps may be used. The

vent terminal must be located NO CLOSER than 12”

off the wall.

Model No.

Size

(in.)

Approved Intakes Approved Plastic

Terminals

Approved SS Terminals

300

4

PVC 90° Elbow,

Sch 40

Galvanized 90°

Elbow SS 90°

Elbow

4" PVC Tee, Sch

40*

FasNSeal FSTT4, Z-Vent 2SVSTTF04

500

850

6

6" PVC Tee, Sch

40*

FasNSeal FSTT6, Heat Fab 9690TEE

Table N: Horizontal Vent and Air Intake Terminals

*Must be ULC-S636 materials in Canada.