Roberts Gorden Tubular Unit Heaters 300 User Manual

Page 17

Advertising
background image

SECTION 6: V

ENTING

11

Figure 6: Separated Combustion Heater - Vertical and Horizontal Vent Termination

Figure 7: Concentric Vent Box

Vent

Termination

Listed Thimble through

Combustible Wall

Vent

12" (31 cm)

Minimum from wall

to vent termination.

Air Intake

Condensate

Trap to Drain

(Optional)

12" (31 cm)

Minimum from air inlet to vent

termination (may be horizontal

or vertical clearance).

Air Intake

Termination

Note: Vent supports not shown

Vent

Air Intake*

12" (31 cm)

Minimum from air inlet to vent

termination (may be horizontal

or vertical clearance).

Vertical

Option

Horizontal

Option

90°

Bend

Model

Vent Diameter

Terminal P/N

UHAS 150 - 400

4" (10 cm)

90502102

Model

*Air Intake Diameter

Terminal P/N

UHAS 150 - 250

4" (10 cm)

90502102

UHAS 300 - 400

5" (13 cm)

90502105

Advertising