The New Yorker Store Cast Iron-Oil Fired Boiler CL User Manual

Page 11

Advertising
background image

11

NOTE: Vertical piping will prevent door from opening

fully for service and cleaning of boiler.

2. Thread relief valve onto factory installed ¾" NPT

x 7¼" nipple located in left rear corner on top

of boiler as shown in Figures 1A and 1B. Valve

spindle must be in vertical position. Tighten with

wrench. Pipe discharge as shown in Figure 9.

Installation of the relief valve must be consistent

with ANSI/ASME Boiler and Pressure Vessel Code,

Section IV.

3. On boilers with rear tankless heater, factory wired

L7224C Control Relay was not installed in heater.

Locate ¾" NPT Immersion Well, apply sealant and

thread into ¾" NPT tapping on heater. Apply heat

transfer paste (not furnished) to control bulb and

insert bulb into immersion well. Tighten clamp

screws to secure control to immersion well. Secure

control conduit to jacket right side panel with 5/8"

cable clamp provided, refer to Figure 1B.

Figure 9: Recommended Boiler Piping for Series Loop Hot Water System

4. CONNECT FIELD WIRING

a. Water boilers without tankless heater and with

front tankless heater. Connect the field wiring

from the circulator to the aquastat control and

from the control to the burner. Make the wiring

connections as shown on Figures 16B.

b. Water boilers with rear tankless heater. Connect

the field wiring from a standard junction box to

the circulator, aquastat control and burner. Make

the wiring connections as shown on Figure 17B.

G.

INSTALL STEAM BOILER TRIM AND CONTROLS,

(see Figures 1C and 1D).
1. Thread ¾" MPT safety valve and ¾" NPT coupling

onto factory installed ¾" NPT x 7¼" nipple located

in left rear corner on top of boiler as shown in

Figure 1C. Tighten with wrench. Pipe discharge as

shown in Figure 11. Installation of the relief valve

must be consistent with ANSI/ASME Boiler and

Pressure Vessel Code, Section IV.

Advertising