Thomas & Betts LDAP 1200 User Manual

Page 29

Advertising
background image

Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 29

FIGURE 18 - Horizontal Vent Terminal

NOTE: Read all measurements; drawing is not proportional.

A clearance thimble is required when flue pipe extends through combustible

materials. Follow the requirements of the thimble and/or the vent pipe manufacturer.

Pitch flue pipe down toward

outlet 1/4” per foot for con-

densate drainage. (NOTE: Slope

applies to entire horizontal vent run.)

12”

( 305 mm)

Wall

Roof or Building Overhang

3 ft (1M)

minimum

6 ft (1.8M) minimum

Reznor (Option CC1)

or Equivalent Vent Cap -

note positions of vent cap

openings (shaded areas)

Parapet or

Adjoining Building

Double-Wall* or Category III

Terminal Vent Pipe

Vent Run

(Comply

with Re-

quirements

No. 1) & 2)

on page 25.)

*Follow the instructions in FIGURES 16B and 16C, pages

26 and 27, to join a double-wall vent terminal section to a

single-wall vent run and to the vent cap.

6” (152mm) minimum

Roof -

pitched

from

0 to 45°

A clearance thimble is required when

flue pipe extends through combustible

materials. Follow the requirements

of the thimble and/or the vent pipe

manufacturer.

Vertical flue extension must

be 6” (152mm) higher than

anticipated snow depth but

no less than 2 ft (610mm) above

the roof.

Roof Flashing

6” (152mm) minimum

Parapet or

A

djoining Building

6 ft (1.8M)

minimum

Double-Wall* or Category III

Terminal Vent Pipe*

Reznor (Option CC1)

or equivalent vent cap

Vent Pipe (Comply with Requirements

No. 1) and 2) on page 25.)

*Follow the instructions in FIGURES 16B

and 16C, pages 26 and 27, to join a double-

wall vent terminal section to a single-wall

vent run and to the vent cap.

FIGURE 19 - Vertical Vent Terminal

NOTE: Read all measurements; drawing is not proportional.

Advertising