Electrical data - 50 hz (10–60ton) – Trane CG-PRC007-EN User Manual

Page 38

Advertising
background image

CG-PRC007-EN

38

Table ED-2 — Electrical Data

Unit Wiring

Motor Data

Model

Nameplate

Voltage

Max Fuse

Rec. Dual

Compressor (Ea)

Fans (Ea)

Tons

Number

Voltage

Range

MCA

Size

Element

Qty.

RLA

LRA

Qty

KW

FLA

10

CGA100BD

380-415/50/3

342-456

24.1

30

2

9.5

63

1

0.57

2.7

15

CGA150BD 380-415/50/3

342-456

32.7

45

2

13.1

99.5

2

0.33

1.6

20

CGAF-C20

380/50/3

342-418

44

60

50

2

17.2

110

2

0.75

1.7

415/50/3

373-456

44

60

50

2

17.2

110

2

0.75

1.7

25

CGAF-C25

38050/3

342-418

55

80

70

2

17.3/25.2

110/174

3

0.75

1.7

415/50/3

373-456

55

80

70

2

17.3/25.2

110/174

3

0.75

1.7

30

CGAF-C30

380/50/3

342-418

65

80

80

2

25.2

174

4

0.75

1.7

415/50/3

373-456

65

80

80

2

25.2

174

4

0.75

1.7

40

CGAF-C40

380/50/3

342-418

81

90

90

4

17.2

110

4

0.75

1.7

415/50/3

373-456

81

90

90

4

17.2

110

4

0.75

1.7

50

CGAF-C50

380/50/3

342-418

97

110

110

4

15.5/24.2

110/174

6

0.75

1.7

415/50/3

373-456

97

110

110

4

15.5/24.2

110/174

6

0.75

1.7

60

CGAF-C60

380/50/3

342-418

119

125

125

4

25.2

174

6

0.75

1.7

415/50/3

373-456

119

125

125

4

25.2

174

6

0.75

1.7

Notes:
1. MCA: Minimum Circuit Ampacity is 125% of the largest compressor RLA, plus 100% of the other compressor(s) RLA, plus the sum of the condenser fan FLA, plus any other

load rated at 1 AMP or more.

2. Maximum Fuse Size: 225% of the largest compressor RLA, plus 100% of the other compressor(s) RLA, plus the sum of the condenser fan FLA, plus any other load rated at 1

AMP or more.

3. Recommended Dual Element Fuse Size: 150% of the largest compressor RLA, plus 100% of the other compressor(s) RLA, plus the sum of the condenser fan FLA, plus any

other load rated at 1 AMP or more.

4. RLA: Rated in accordance with UL standard 1995.
5. Local codes may take precedence.
6. Control kw includes operational controls only. Does not include evaporator heat tape.
7. All units are across the line starting. Compressors will never start simultaneously.
8. One 240/50/1, 5 AMP jobsite provided power connection is required to operate the evaporator heat tape.

(10–60 Ton)

Electrical
Data - 50 HZ

Advertising