10. Run the thread from the sub thread tension regulator (15) through the spiral tube (15).
11. Run the thread further through the thread guide (15)-1, thread tension regulator (15) rotary sensor (15) and thread

guide (15)-2.

12. Open next the needle bar case cover.
13. Raise the thread holder lever (GL), hook the upper thread on the thread holder (15) from right to bottom and pass

the thread through the hole of take-up lever (15) at the top.

14. After that, run the thread down and through the thread guide (15)-3, then through the hole of the needle (15) and

finally through the hole in the presser foot (15).

15. Hook next the thread end on the thread holding spring.
16. Set the thread of spools (14) to (1) in the same manner. Finally, push down the thread holder lever (GL) down to

finish the setting of upper thread.

Fig. B Passing the Upper Thread:

Thread Guide to Needle

Tension base

Sub thread tension regulator (15)

Thread guide

Thread guide (15)-1

Thread tension
regulator (15)

Rotary sensor (15)

Thread guide (15)-2

Spiral tube (15)

Take-up lever (15)

Thread holder (15)

Thread holder lever

(GL)

Thread guide (15)-3

Needle (15)

Presser foot (15)

Thread holder spring

Threader

T O Y O T A

E X P E R T E S P 9 0 0 0

Needle bar
case cover

Needle bar
case

Advertising