Checkups before starting operation, Caution – TOYOTA EPS9000 User Manual

Page 25

Advertising
background image

PREP

ARAT

IO

N

25

CHECKUPS BEFORE STARTING OPERATION

Before starting the machine, carry out checkups as indicated below.

CAUTION

Turn the main switch OFF before checking the machine prior to starting the operation.
If you check the machine without turning the main switch OFF, you could sustain injury.

Check Point

Description

Action

Covers

Check for disengagement.

Install if disengaged.

Thread

Check for disengagement.

Set if disengaged.

Check for breakage.

Set if broken.

Needle

Check for bend.

Replace if bent.

Check for breakage.

Replace if broken.

Rotary hook rail

Check if appropriate amount of
oil applied.

Lubricate as required.

FD07

!

Advertising