Wayne-Dalton TORQUEMASTER 46 User Manual

Page 16

Advertising
background image

16

Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your

local yellow pages/business listings or go to the

Find a Dealer section online at www.wayne-dalton.com

Tools Needed:

Tools Needed:

13

14

Top Section

When installing a door with a
TorqueMaster

®

Plus counterbalance

system, vertical track alignment is
critical. Position flagangle between
1-11/16” (43 mm) to 1-3/4” (44 mm)
from the edge of the door. Tighten the
bottom lag screw. flagangles must be
parallel to the door sections. Repeat for
opposite side.

IMPORTANT: ThE DIMENSION BETWEEN
ThE fLAGANGLES MuST BE DOOR WIDTh
PLuS 3-3/8” (86 MM) TO 3-1/2” (89 MM)
fOR SMOOTh, SAfE DOOR OPERATION.

Complete the vertical track installation
by securing the center jamb bracket(s)
and tightening the other lag screws. Push
the vertical track against the rollers so
that the rollers are touching the deepest
part of the curved side of the track (see
illustration). Tighten all the carriage bolts
and nuts. Repeat for opposite side.

vertical Track Alignment

DOOR WIDTh

+3-3/8” TO 3-1/2”

NAIL

1-11/16” TO 1-3/4”

fLAGANGLE

TOP SECTION

Place the top section in the opening and

vertically align with lower sections.

Temporarily secure the top section by

driving a nail in the header near the

center of the door and bending it over

the top section.

Now flip up the hinge leaf against

section, fastening center hinge(s) first

and end hinges last.

Power Drill

7/16” Socket

Driver

Tape Measure

hammer

Nail

Power Drill

7/16” Socket

Driver

7/16” Wrench

Tape Measure

ROLLER

VERTICAL TRACk

ROLLER AGAINST

VERTICAL TRACk

Advertising