Wayne-Dalton TORQUEMASTER 46 User Manual

Page 7

Advertising
background image

7

Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your

local yellow pages/business listings or go to the

Find a Dealer section online at www.wayne-dalton.com

INST

All

ATION

Begin the installation of the door by checking the opening. It must be the same size as the door. Vertical jambs must be plumb and the
header level. Side clearance, from edge of door to wall, must be minimum of 3-1/2” (89 mm) on each side.

IMPORTANT: STAINLESS STEEL OR PT 2000 COATED LAG SCREWS MuST BE uSED WhEN INSTALLING CENTER BEARING BRACkETS,
END BRACkETS, jAMB BRACkETS, OPERATOR MOuNTING/SuPPORT BRACkETS AND DISCONNECT BRACkETS ON TREATED LuMBER
(PRESERVATIVE-TREATED). STAINLESS STEEL LAG SCREWS ARE NOT NECESSARy WhEN INSTALLING PRODuCTS ON uNTREATED
LuMBER.

NOTE: It is recommended that 5/16” x 2” lag screws will be pilot drilled using a 3/16” drill bit, prior to fastening.

Advertising