Installation specification – STIEBEL ELTRON FCR 18-28 User Manual

Page 22

Advertising
background image

22

| FCR 28 | FCR 18 www.stiebel-eltron.com

InStallatIOn

Specification

14.2.2 dual circuit / single circuit operation 3/n/Pe ~ 400 V
Fcr 28/120, part number 071332

Fcr 28/180, part number 071333
6/12 kw, 12/12 kw, 9/18 kw, 18/18 kw

2

L3

L2

L1

N

1

4

3

4

3

5

1

2

26

�02

�7

9�

002

2

1 Heating element

12 kW connected load: 3 x 4 kW

18 kW connected load: 6 x 3 kW

2 Contactor

3 Thermostat

4 Circuit breaker I / II

5 High limit safety cut-out
connection example for dual circuit operation, version 1

2

L3

L2

L1

N

1

4

3

1

2

26

�0

2�

79

�0

01

9

1 Power-OFF contact, installed by the heating contractor

2 Pushbutton for controlling the rapid heat-up function re-

motely, installed by the heating contractor

With standard heating in switch position I and II, reheating is also

possible during off-peak tariff periods.

connection example for dual circuit operation, version 2

2

L3

L2

L1

N

1

4

3

1

2

26

�0

2�

79

�0

04

7

1 Power-OFF contact, installed by the heating contractor

2 Pushbutton for controlling the rapid heat-up function re-

motely, installed by the heating contractor

With standard heating in switch position II reheating is also possi-

ble during off-peak tariff periods. With standard heating in switch

position I, reheating is not possible.
connection example for dual meter reading

K1

K2

K1

K2

2

L3

L2

L1

N

1

4

3

1

2

3

4

26

�02

�7

9�

002

0

K1 Contactor 1, installed by the heating contractor

K2 Contactor 2, installed by the heating contractor

1 Pushbutton for controlling the rapid heat-up function re-

motely, installed by the heating contractor

2 Power-OFF contact, installed by the heating contractor

3 Off-peak tariff

4 Peak tariff

Advertising