4 switch–on phase, 4 switch-on phase, Internal check of the electronics – VEGA VEGASON 66 4 … 20 mA_HART four-wire User Manual

Page 28

Advertising
background image

4 ... 20 mA

PE

/ L
/ N

L1 N

GND

1

2

1

2

3

4

4...20mA

IS

Fig. 20: Wiring plan, double chamber housing

1

Voltage supply

2

Signal output

5.4 Switch-on phase

After connecting VEGASON 66 to power supply or after a

voltage recurrence, the instruments carries out a self-check for

approx. 30 seconds:

l

Internal check of the electronics

l

Indication of the instrument type, the firmware as well as

the sensor TAGs (sensor designation)

l

Output signal jumps briefly (approx. 10 seconds) to the set

fault current

Then the corresponding current is transmitted to the cable.

3)

3)

The value corresponds to the actual measured level as well as to the set-

tings already carried out, e.g. default setting.

Wiring plan

Switch-on phase

Connecting to voltage supply

28

VEGASON 66 - 4 ... 20 mA/HART - four-wire

28783

-EN

-060731

Advertising