Once choose the function that to perform and click on “Execute”

Note: UPS must supports those function to perform it

Test Control

• UPS Self Test: Execute UPS Self Test
• UPS Calibration Test: Execute UPS Calibration Test

Turn-Off Parameters

• Turn-Off Delay: To set the buffering time for UPS before shutdown
• Sleep Time: To set UPS sleep time.

Test Period

• Unknown: This defined by UPS configuration.
• Two weeks: Perform UPS test every two weeks
• Weekly: Perform UPS test every week
• Disable: Do not perform UPS test