37

EntelliGuard R Circuit Breaker Retrofill AKD-8 Installation Manual DEH-41549 02/12

Modify AKD-8—Switchgear Compartment

Cut Power to AKD-8—Switchgear

It must be ensured that the supply power to

the compartment is turned off/

compartment is de-energized for all the

incoming and outgoing circuits of the LVS

prior to any work being conducted on it.

During the installation and related work on

the equipment, it must be ensured that the

operator is using the prescribed PPE for the

specified tasks.

Ensure only qualified personnel install, operate, service, and maintain all electrical

equipment.

1. Before modifying the switchgear compartment, de-energize/switch off the breaker. If the circuit breaker

is ON and the springs are charged, to turn it off, press the OPEN button on the circuit breaker fascia, and
ensure that the circuit breaker contacts are open.

Rack Out AKD-8—Legacy/Existing CB
1.
To rack-out legacy (old or original) breaker from compartment, refer to your legacy-breaker’s manual on

how to remove the existing breaker.

Check, Clean, Grease AKD-8—Compartment
1.
Inspect the compartment for damage, rework.
2. Check cabinet for suitability of Retrofill.
3. Check each breaker compartment for bolted joints in the primary disconnect bars. Where such joints

exist, check the bolts for tightness.

4. Inside the compartment, check the contact areas on each primary disconnect bar or cluster of fingers for

foreign matter that may have accumulated. Clean those areas if necessary with a clean, lint-free rag and
isopropyl alcohol or acetone.

5. Be sure to apply a thin film of electrical grease (red, D50H47) to the contact areas for better electrical

connections inside the compartment.

Install New Door

1. To remove existing compartment door(s), refer to your manual on how to remove the legacy doors.
2. To install new door, refer to the

Retrofilll Door Assemblies, DEH-41563

.