GE Industrial Solutions MicroVersaTrip Plus and MicroVersaTrip PM AK-1-15, AK-1-25 User Manual

Page 11

Advertising
background image

11

4. Remove the retaining clip from the center

mounting post of each line and load draw-out

primary contact finger assembly, as shown in

Figure 20, then remove the fingers. Be sure to

save the existing flat washer from each assembly

for reuse, but discard the retaining clip.

5. Remove the three mounting screws on the exist-

ing current sensor triangular retaining plate on

each breaker pole. Remove and discard the

plates.

6. Remove and discard the existing current sensors,

trip actuator, trip device, trip device mounting

bracket, and CT wire harness from the breaker.

Refer to the original manufacturer’s operating

and maintenance manuals for details on

performing this step.

7. Remove the two mounting bolts on the existing

shunt on each pole of the breaker, as shown in

Figure 21, then remove and discard the shunt.

Replace the mounting hardware with the two

5

/

16

-18 x 1

3

/

4

" hex-head bolts, lock washers, and

flat washers provided, as shown in Figure 22.

Continue back frame conversion with installation of
the phase sensors (CTs).

Figure 20. Draw-out primary contact finger assembly removal.

Figure 21. Removing the shunt mounting bolts.

Figure 22. K-3000S with CTs and shunts removed.

Advertising