J85568E-1 Secondary DC Mini-Distribution Bay

Issue 6 January 2008

Installation 5 - 1

5

Installation

Safety

Read Section 4, Safety, carefully before installing the J85568E-1
Mini-Distribution Bay.

Tools and
Materials
Required

The following tools are required to install the Mini-Distribution
Bay:

Equipment to handle shipping container, remove
Mini-Distribution Bay unit or framework, and erect unit in
final position (minimum lifting capacity of 220 pounds)

Common electrician’s hand tools, including jeweler’s
screwdriver, electrical tape, wire cutters, and strippers for

8 AWG to 750 MCM

Common mechanic’s hand tools, including flat blade
screwdriver, socket and torque wrenches for 1/4-inch and
3/8-inch bolts, and a crowbar for uncrating unit

Proper crimping tools and dies for connectors. The
connectors specified are WP-91412, which may be installed
with compression tools made by Thomas & Betts using
color coded dies

3/4-inch drill to bore holes for floor anchors (List A only)

Anchor bolts (List A only)

22-26 gauge stranded or solid wire for connecting alarms

Terminal lugs for terminating distribution and load cables

WP-92461 fuses and 1/2-ampere GMT alarm fuses
(comcode 401231501) or circuit breakers