Figure 5-1: typical floor mounting detail, Figure 5-2: floor mounting template – GE Industrial Solutions Micro-BDCBB User Manual
Page 31
Advertising
Figure 5-1: Typical Floor Mounting Detail
Framework Base
Hold Down Plate
Floor Anchor Bolt
Hold Down Washer
Floor Covering
Note: Use 3/4 Inch Drill for Floor Anchor Bolts.
The Required Minimum Drill Depth is 4 Inches.
Figure 5-2: Floor Mounting Template
1
1
1
1
2
2
2
2
25.94
18.50
1.24
3.72
1.20
1.24
7.25
9.78
If interference with floor reinforcing bars occurs during installation of anchoring
hardware at mounting position "1" (primary mounting positions), use position "2"
alternate mounting positions.
J85568E-1 Secondary DC Mini-Distribution Bay
Issue 6 January 2008
Installation 5 - 3
Advertising