3 from manual bypass (q2) to normal function vfi, From manual bypass (q2) to normal function vfi – GE Industrial Solutions SG Series 100 – 120 – 150 kVA Operating Manual User Manual

Page 44

Advertising
background image

Modifications reserved

Page 44/82

OPM_SGS_USM_M10_M15_0US_V030.doc

Operating Manual SG Series 100 – 120 - 150 kVA

7.1.3 From Manual Bypass (Q2) to normal function VFI

Initial status:

Load supplied from Manual Bypass.

1. Close Q1 (Pos. I).

Bypass connects to Load.

LED Load on Bypass lights up.

Rectifier starts automatically and LED

in Rectifier symbol and LED Battery
charge light up.

2. Open Q2 (Pos. O).

LED Manual Bypass turns OFF.

3. Connect the Battery to the UPS by closing the Battery Switch or Fuses, in case of

External Battery .

4. Press inverter on ( I ) key.

• Soft-start of Inverter, indicated with

blinking LED.

• At the end of Soft-start the LED

remains lit.

• Automatic transfer from Bypass to

Inverter.

• UPS output LED indicates Load on

Inverter.

The LCD must display on the main screen the status “LOAD ON INVERTER”.

END OF PROCEDURE

Advertising