7.3.4 Separate a Unit from the parallel system (System Redundancy)

Initial status: Load supplied from all Inverters.

First operated unit

All other units of the system

1. Press and hold inverter off ( O ) key on the Unit to separate, until the LED turns OFF.

Load supplied from Inverter(s) of the other Unit(s) of the parallel system

.

First operated unit

All other units of the system

2. Open Q1 (Pos. O) and, only when the LED service check is ON, press total off button

on the Unit to separate.

First operated unit

All other units of the system

3. Disconnect the Battery, in case of External Battery, from the Unit to separate.

Wait 5 minutes for DC-Link Capacitors discharge.

4. Disconnect the Utility supply from the separated Unit.

First operated unit

All other units of the system

END OF PROCEDURE