GE Industrial Solutions SG Series 100 – 120 – 150 kVA Operating Manual User Manual

Page 73

Advertising
background image

Modifications reserved

Page 73/82

OPM_SGS_USM_M10_M15_0US_V030.doc

Operating Manual SG Series 100 – 120 - 150 kVA

3. Disconnect the Battery from all Units.

• Wait 5 minutes for DC-Link Capacitors discharge

.

First operated unit

All other units of the system

4. Disconnect the Utility supply from all Units.

All LED’s are OFF.

First operated unit

All other units of the system

END OF PROCEDURE

Advertising