Inspections and maintenance, 1 list of inspections, Type of the inspection – GE Industrial Solutions GERAPID 8007R, 10007R WITH ARC CHUTES 1X2, 1X3 User Manual

Page 29

Advertising
background image

2010-02-16 DTR01807 rev.02

Design and specifications are subject to change without notice

29

6. Inspections and maintenance

6.1 List of inspections

TYPE OF THE

INSPECTION

BY WHOM

HOW OFTEN

WHAT TO DO/CHECK

A. General visual

inspection

-Customer

-Trained technician

At least once a year.

Check for damages or cracks of the
frame, adapter or arc chute

Check for missing screws or caps

Check for damaged labels

Check for corrosion

Check for distinct manifestations of flame
or smoke at the frame

Clean the breaker from dirt and dust

Clean and degrease the copper terminals

B. General functional
inspection

-Customer
-Trained technician

At least once a year.

Manually close and open the breaker to
check the drive and mechanism

Close the breaker electrically and open by
trip unit(s) releasing, to check controls

Check the blockade of POCT

C. Inspection of the arc
chute and contact

system

-Customer
-Trained technician

After:

high short circuit
opening over 25 kA

300 openings at load
current or frequent

overload switching.

At least once a year.

Check for wear of the arc probes; shall not
exceed 30 % of its cross section

Check for wear of the pre-arcing contact.

It shall not exceed 2 mm [0.08 in].

Check for wear of the main contacts at
fixed and flexible sides; shall not exceed

1.5 mm [0.06 in] of its depth.

Check for wear of the arc chute plates;
check for deposits inside of arc chute, this
area shall be free of deposits.

Check for wear of protective walls; shall
not exceed 1 mm [0.04 in].

Check for contact tilt and gaps.

D. Inspection of the

screw/bolt connections

-Customer

-Trained technician

After every inspection:

of the arc probes

of the contacts

of the arc chute


At least once a year.

Check the position of the countersunk screws

in the sidewalls.

Check for tightness or use torque tool (torque
in SI and Imperial units):

M8 ~20 Nm [~ 177 in-lbs]

M6 ~10 Nm [~ 88 in-lbs]

M5 ~5 Nm [~ 44 in-lbs]

M4 ~3 Nm [~ 26 in-lbs]

E. Inspection of the
mechanic components

-GE
-Service technician

After 5.000 openings

At least once every 4
years

Carry out inspection “B” above

Check out settings of the main contacts
and auxiliary switch

Check out upper dumper of the
mechanism; no cracks, deformation or

heavy discoloration; hard consistency;

without punctures

Check out main flexband breakage; shall

not exceed 30 % of its cross section

Check out wear of mini flexband; shall not
exceed 30 % of its cross section

Clean and degrease UVR latch and quick
latch of the mechanism. Apply dash of

Beacon EP2 grease afterwards.


Required tools:

Cleaning tissue; abrasive paper; manual closing lever; metric hex (Allen) wrenches SW5, SW6; Torx® wrenches size T30,T 40, T45;

small and medium screwdrivers; ratchet with 10 mm hex socket; pliers; tongs.
Dispose of the breakers if required:
Pay attention to the national and local regulations of disposal!

Advertising