GE Industrial Solutions SG Series 50 & 80 kVA Operating Manual User Manual

Page 60

Advertising
background image

Modifications reserved

Page 60/82

OPM_SGS_USM_50K_80K_0US_V030.doc

Operating Manual SG Series 50 & 80 kVA

3. Disconnect the Battery, in case of External Battery, from all Units.

• Wait 5 minutes for DC-Link Capacitors discharge

.

First operated unit

All other units of the system

4. Disconnect the Utility supply from all Units.

• All LED’s are OFF.

First operated unit

All other units of the system

END OF PROCEDURE

Advertising