GE Industrial Solutions SG Series 50 & 80 kVA Operating Manual User Manual
Page 73
Advertising
Modifications reserved
Page 73/82
OPM_SGS_USM_50K_80K_0US_V030.doc
Operating Manual SG Series 50 & 80 kVA
3. Disconnect the Battery from all Units.
• Wait 5 minutes for DC-Link Capacitors discharge
.
First operated unit
All other units of the system
4. Disconnect the Utility supply from all Units.
•
All LED’s are OFF.
First operated unit
All other units of the system
END OF PROCEDURE
Advertising