Tenant breaker panel – GE Industrial Solutions EPM4500 Submeter User Manual

Page 22

Advertising
background image

2–8

EPM 4500 SUB METER – INSTRUCTION MANUAL

WIRING

CHAPTER 2: INSTALLATION

FIGURE 2–3: 1-Phase 3-Wire 120 V Wiring (Network)

709722A1.CDR

ØA

ØB

ØC

IA

IB

IC

NA

NB

NC

N

120/208V

277/480V

347/600V

Ferrite

Beads

Power

Header

MC-

5

CT3

CT1

CT4

CT2

MCI

INTERF

ACE

T

enant

Breaker

Panel

Conduit

RECOMMENDED:

Service

Disconnect

Switch

15A

Fast

Acting

Only

Phase

A

(ØA)

Phase

B
(ØB)

Phase

C
(ØC)

BL

RD

BK

BK

RD

BL

WH

BK

RD

BL

BK

RD

BL

To
C

T

1

To
C

T

3

T

o

CT2

T

o

CT4

CT

Header

CT

Header

CT

Header

CT

Header

RD

BL

BK

Shorting Links

WH

BK

WH

RD

WH

BL

WH

BK

WH

RD

WH

BL

WH

BK

WH

RD

WH

BL

WH

BK

WH

RD

WH

BL

WH

BK

WH

RD

WH

BL

WH

BK

WH

RD

WH

BL

WH

BK

WH

RD

WH

BL

WH

BK

WH

RD

WH

BL

Diagram

2.
Shorting

Links.

See

Inst

allation

Notes

for

det
ails.

Power

Source

Connect

CT

Header

to

meterhead

A

B

C

Load

Load

Load

Diagram

3.
CT

Phasing.

Dot

or
H1

should

point

towards

the

line

or

source.

Reference

V

olt
age

CRITICAL

-

Current

T

ransformers

(CT)

must

be

inst

alled

correctly

.

See

Diagram

1

for

CT

inst

allation

for

each

meter

point.

See

Diagram

3

for

CT

polarity

and

T

able

1

for

Phase

Association

relationship

s.

Diagram

1.
Current

T

ransformers

inst

alled

inside

tenant

breaker

p

anel.

LINE

SOURCE

BK/RD/BL

WHITE

Dot

H1

TENANT BREAKER PANEL

Meter #5

Meter #6

Meter #1

Meter #3

Meter #4

Meter #2

Meter #2

BK

ØA

BL

ØC

BK

WH

WH

ØB

Meter #1

ØA

RD

WH

BK

WH

ØB

RD

WH

BL

ØC

WH

BL

RD

Meter #3

TENANT BREAKER PANEL

Meter #11

Meter #12

Meter #10 Meter #9

Meter #8

Meter #7

N

BK

RD

BL

BK

RD

BL

WH

WH

WH

WH

WH

Neutral

WH

WH

Advertising