1 through 4, Initial operation – John Wood Noritz N-069M-DV User Manual

Page 11

Advertising
background image

11

Initial Operation

Before the first use of your water heater, make the following preparations.

Follow steps

1 through 4

.

1

Open the water supply valve.

Open a hot water fixture to confirm that
water is available, and then close the
fixture again.

3

Open the gas supply valve.

Hot water fixture

2

Turn on the power.

CLOSED

4

OPEN

SAR8192-2_001_013_E_J.p65

05.11.29, 9:00 PM

Page 11

Adobe PageMaker 6.5J/PPC

Advertising