Vent terminal installation procedure – John Wood Noritz N-069M-DV User Manual

Page 71

Advertising
background image

71

Flue collar of water heater

Center line of vent terminal

8" to 9.7"

5.6"

5.6"

Screw holes (4)

(0.3" diameter and 1.4" to 1.6" depth).

6.3" diameter hole for vent terminal sleeve

4.

Vent Terminal Installation Procedure

* When drilling, take care not to damage electric

wiring, or gas or water piping in walls.

1) Determine the vent terminal installation location and make a 6.3" diameter hole in the wall for the

sleeve and 0.3" diameter holes for the screws to hold the sleeve.

Remove this screw
and slide out the
external cylinder.

Slide out the external cylinder
until it is flush with the external wall
and replace the screw.

2) Adjust the sleeve length to fit the wall thickness. Install the sleeve with the

symbol on the top side.

Rounded wood
screw

Sleeve

Wall anchor

6.3" dia.

Waterproof the clearance
with a high temperature sealant

3) Waterproof the clearance between the sleeve and

wall with a high temperature sealant.

Sleeve

Waterproof the clearance
with a high temperature
sealant.

This symbol should
be on the top

SAR8192-2_068_073_E_J.p65

05.11.29, 9:01 PM

Page 71

Adobe PageMaker 6.5J/PPC

Advertising